Dicor Rubber Roof Coating Drying Time

But because it takes so long to cure 80 it might be wise to let it dry for 48 hours before letting it get wet.
Dicor rubber roof coating drying time. Factor these things into your planning as well. Ft per coat i e. 8 x 30 roof takes 4 gallons. Acrylic coating is an excellent protective barrier extending the life of your rubber roof membrane.
Actual gallons required will depend on the type of surface and texture method of application and weather conditions at the time of application. Dicor acrylic coating shall be applied in a minimum of 2 coats at a rate of 1 gallon per 125 sq. Dicor s lap sealant becomes waterproof in just 4 hours. Dicor acrylic coating shall be applied in a minimum of 2 coats at a rate of 1 gallon per 125 sq.
Provides superior weather ability uv resistance. Saves over 25 in labour compared to similar systems. If the repair is applied properly the patch should last the duration of the membrane. A full 30 days is needed before this lap sealant is fully cured.
Refrain from doing anything else with the rv during this time and avoid rain and other hazards as best you can. If my roof has to be repaired how long should i expect the patch to last. Cure time once applied roof coatings take 24 to 48 hours to fully cure and strengthen its bond with the roof. Use with dicor rubber roof cleaner activator for proper adhesion.
So that would be the minimum time frame you would be looking at. My roof has developed mold mildew. Actual gallons required will depend on the type of surface and texture method of application and weather conditions at the time of application.